FHOR Earthwork calculation includes the sum of the amount of earthwork filled and excavated. The earthwork calculation method is as follows: the distance between two adjacent cross-sections is taken as the calculation unit, that is, the area of the subgrade on two adjacent cross-sections and the distance between two cross-sections are calculated respectively.Our units are m and m³.
The calculation of earthwork is an important step in engineering construction.